{
  "number": 1,
  "title": "Main, Water and West Water signal review",
  "category": "Draft request",
  "status": "Draft prepared; not submitted",
  "revision": 1,
  "revisionDate": "2026-10-17",
  "submittedDate": null,
  "topicId": "water-main",
  "scope": "Review signal timing, opposing approach phases and the Water Street left turn onto Main, including through traffic delays and pedestrian access.",
  "records": [],
  "related": [
    4
  ],
  "source": "Facebook comments in IMG_9038, IMG_9043, IMG_9044, IMG_9045 and IMG_9050.",
  "history": [
    {
      "date": "2026-10-17",
      "event": "Revision 1 assigned to the prepared request. No submission recorded."
    }
  ],
  "requestText": "Please review traffic operations at Main Street, Water Street and West Water Street, particularly the left turn from Water onto Main. Residents report difficulty making that turn and delays for vehicles continuing straight. Please consider whether changes to signal timing or phasing, including a protected left turn or separate phases for the opposing approaches, could improve safety and traffic flow while maintaining pedestrian access.",
  "reference": "CM Traffic 2026/001",
  "assignedDate": "2026-10-17"
}
